The project consists of : A complete renovation of the substations (exchangers, collectors, variable flow pumps, valves, regulation, metering according to GEP,…), the addition of 1 to 2 gas-fired cogeneration units for a total thermal capacity of around 1.5 MW (this cogeneration would produce approximately 50% of the heat required to heat the site).
The possible replacement of the old 10 MW gas boiler (dating from 1975) by a 6 MW condensing boiler. The complete replacement of regulation: cascade management, network climate regulation, variable flow regulation of the network, substation regulation.
This project has been selected in the framework of the call for projects “Improving energy efficiency in public buildings” for 2018.
Address: CAMPUS DE LA PLAINE Boulevard du Triomphe – Bruxelles 1050 Belgique
Projects category: Axe 3
Website: WEBSITE ULB BRUSSELS
Links: –
Programme: 2014 – 2020
Total budget: 4.38 Mio €
EU + BCR Budget: 2.13 Mio €
Campus de la plaine ULB / VUB
CAMPUS DE LA PLAINE Boulevard du Triomphe Bruxelles 1050 Belgique